About NCUCC > Great Events

Time

Event

1975

IBM 370/125 small-scale computer

1980

IBM 4331-J1,VM/CMS System

1982

CDC CYBER 170/720 computer system

1985.08

Computer Center moved from the old building to Chi-Hsi Hall

1987.08

DEC VAX 8650 System

1988.06

DEC VAX 3600

1989.06

Construction of the Campus Telecommunication System

1990.05

DEC VAX 3300 & 3100

1990.05

SPARC workstation

1991.05

DEC VAX 4300

1991.12

DEC VAX 9320 large-scale computer

1992.05

IBM RS6000

1992.05

DEC VAX 4600

1992.10

Second stage of wires and equipment works for the optical fiber network

1993.12

Fourth stage of campus network completed

1994.09

Network construction of postgraduate students’ dormitory

1995.05

IBM 6000/990

1995.05

SUN Workstation

1996.08

Internal network construction of Science 4 Building

1996.12

Internal and external network construction of male dormitory 13

1997.09

Improvement works for the campus’ high speed network environment

1997.12

DEC Alpha 4000

1998.07

Network construction of Mechanical Engineering Department

1998.09

Wiring for the second high speed optical fiber network

1998.11

Second network construction of Liberal Arts Hall 1 & 2

1999.03

Network construction of Girls' Dormitory 14

2000.01

Network construction of K. T. Lee Library

2000.09

Network construction of Science Hall 1 & Astronomical Observatory

2000.11

Computer network renovation of the students’ dormitory

2000.12

Computer network integration of the Office of Students’ Affair

2001.01

Internet wiring of Optical Science Department

2001.08

Telephone system and computer network construction of the Administration Building

2002.01

Wireless Network Construction (Chi-Hsi Hall, Management Building 2, Conference Room on the 3rd floor of the Administration Building, Grand Lecture Hall, the Auditorium and Yi-Ren Hall)

2002.02

The Network Property Inquiring System online

2002.03

Purchasing equipments for wireless network Construction

2002.03

The Graduate Verification System online

2002.03

Second version of the Academic Affair System under development

2002.04

Equipments and wiring for the New Era Gigabit Backbone Network completed

2002.05

Take over the management of Educities E-10k Host

2002.08

Optical fiber network construction of the Computer Center’s control room

2002.08

College Entrance Exam United Distribution System completed; Starts providing enquiries about the entrance results and other services

2002.09

Official Documents Flow Path Control System online

2002.09

Synchronous distance lecturing via ISDN Synchronized Network

2002.12

Development of New Students’ Enrollment and Registration System completed

2002.12

New backbone framework testing experiment for the NBEN(National Broadband Experimental Network)

2002.12

NBEN GigaPOP Case Study Planning and Implementation

2002.12

Improvement work of the Archive Office Official Documents Receiving and Transmitting Management System

2002.12

Construction of NCU Computer Network Exhibition Entrance Website

2002.12

Campus Network Flow Rate Monitoring Interface

2002.12

Considered by the Ministry of Education the only extraordinary excellent unit in operations among the 11 Local Area Network Center

2003.02

Second version of the Academic Affairs System online

2003.02

Second Layer Network Converter

2003.02

Academic Loan System online

2003.03

Spam Filtering Mechanism System on test

2003.03

Executing the TWNIC(Taiwan Network Information Center) internet related courses propelling plan

2003.03

Establishment of Cisco Network Academy and CCNA (Career Certification & Paths) Related Researching Courses

2003.03

Participation in Ministry of Education’s TANet spam prevention project

2003.07

Planning and construction of the network backbone

2003.08

Development of New Students’ Enrollment and Registration System completed

2003.11

Participation in the Management and Maintenance of TWAREN Asia Pacific Central Project Operating Center

2003.11

Network base and teaching platform constructions of the University System of Taiwan(UST)

2003.11

E-Learning teaching platform construction of the UST

2003.11

Development and Construction of the Campus’ Wireless Network Certificating System; Provides roaming mechanism for UST

2003.11

Participation in TWAREN Asia Pacific Central Project – The new backbone framework testing experiments project for high quality academic research network

2003.11

Postgraduate Students Enrollment Computer Distribution System completed

2003.11

UST Transfer Students Enrollment, Grades Management and United Distribution System completed

2003.11

English site of the Academic Affairs System Second Version

2003.12

New Development of First Distribution Operation of the Course Selection System

2004.02

Restoration of the Computer Center’s Office

2004.03

Campus’ high speed backbone construction completed

2004.03

Construction of MCU (MultipointControl Unit)

2004.03

Assisted the Astronomy Department to connect the astronomy center at Mt. LuLin with NCU

2004.03

Virus filtering mechanism of the mail server

2004.03

New Development of Course Adding/Dropping and Distribution of the Course Selecting System

2004.03

Working Students Enrollment System online

2004.03

English Proficiency Test Registration System online

2004.03

UST Asynchronous Internet Teaching Platform – Construction and Lead-in of the Blackboard System

2004.04

NCU North Village UTP Wire Replacement

2004.05

Network construction of Science Building 5

2004.07

Network construction of Guest Lodge 2

2004.08

Network renovation of NCU Village Singles Dormitory

2004.08

Blackboard System online, lecture materials digitalize

2004.08

Official Documents and Electronic Form Flow Path Management System

2004.09

Network construction of Engineering Building 5

2004.09

Network renovation of postgraduate students dormitory

2004.09

Wire and network equipment renovation of the Administration Building and Chung-Cheng Library

2004.10

Assisted the network construction of Library’s VOD

2004.10

Integration of Campus Wireless Network and Roaming Project

2004.10

Assisted the High Energy Physics Lab in constructing of the LCG Grid Operation Environment in the Computer Center

2004.10

Participate in NCHC (National Center for High-Performance Computing) UniGrid Project Construction

2004.12

Renovation of the faculty’s dormitory network backbone

2005.01

Official Documents Generating System online

2005.04

Participated in propelling the TWNIC SIP/ENUM Trial Project (VoIP)

2005.04

Participated in executing the TANet North Area SPAM Prevention Project

2005.04

Participated in executing the TWAREN VXML Voice Website Project

2005.04

Participated in propelling the TANet IPv6 Experimental Project Construction(I)

2005.04

Campus’ network security and bandwidth management

2005.04

PPPoE Server provides internet updates for virus infected dormitory network clients

2005.04

Radius and LDAP Server provides network security mechanism

2005.04

Article Management System online

2005.04

Grades Management System online

2005.04

IPv6 network connection under development and testing

2005.06

The new Property Management System online

2005.08

Network Hacking Detection and Defense System for the campus’ network

2005.08

Testing of the TWAREN Education Network IPv6 Services

2005.08

Broadband Wireless Access (WiMax) in experiment

2005.09

Host Management Services

2005.10

Electronic Form System online

2005.10

Property Depreciation Management System under development

2005.11

Campus’ Website Entrance under construction